Cast House Cooling Water System Design

Comtec have been involved in the design of several upgrades to Vertical Direct Chill (VDC) and Ingot cooling water supply systems. Flowrates up to 13,000 litres per minute have been achieved in high heat removal billet casting stations. System design included pump specification, piping design, cooling tower selection, filtration design, header tank specification (VDC Systems) and Instrumentation and Control System design and specification.



« Back to Projects